Projektart: Reconstruction measure smoke extraction system
Auftraggeber: Sprinkenhof GmbH
The property, the Hamburg State Opera, is an existing building. All the functions of the existing system were converted from a worn-out pneumatic system to a 24 V smoke extraction system with its own emergency power supply.